Balgasiiin Ulaan Nuur Groundwater Resources Exploitation Project
Ecotrade LLC completed Environmental baseline survey in 2005and Environmental Impact Assessment in 2008 for Balgasiin Ulaan Nuur Groundwater resources Exploitation Project on behalf Khangad Exploration XXK/ QGX Inc. They have been starting mine development in Baruun Naran Coal Deposit located about 55 km to north east direction.
Balgasiin Ulaan Nuur groundwater resources explored in 19984-1987 and 2007-2008 and estimated total resources as 150.3 l/sec. And this groundwater resource is one of fresh water resources within the Gobi region Mongolia.
Balgasiin Ulaan Nuur groundwater resources explored in 19984-1987 and 2007-2008 and estimated total resources as 150.3 l/sec. And this groundwater resource is one of fresh water resources within the Gobi region Mongolia.
By the EIA Results have limited max groundwater abstraction as 125 l/sec with 3 m drawdown of groundwater levels. And indicated and mapped local water sources of nomadic peoples and herder camps which may effect during long-term groundwater abstraction. Environmental Management and Monitoring Program prepared based on outcomes of EIA of groundwater resources exploitation.